Interim Crit 2 | Panels' comments
- bingxinn
- Jun 10, 2020
- 1 min read
Comments 1 Floor plan not responding to site's boundary and roundabout
: Will adjust the building allocation facing the roundabout
2 Lack of nodes in the building
: To think in more details and illustrate the interrelation in between the greens
and building spaces 3 Lack of focal point of the building
: Revise the ground floor plan, to further enhance the central courtyard, and to
have different secondary courtyards
4 The location of the drop off point is not in the middle enough in the building
: To create a vehicle way around the building (with grasscrete) , and to provide
another drop off point
5 Architectural language still look institutional
: The building material is not applied in the massing model, will apply building
material (timber, and other elements to make it look more homely)
6 To consider and calculate is it economically feasible
7 Reduce the accommodation floor level if it's not necessary
Comments